3D preview of OPGW Cable Route Assembly
Loading the interactive model…
Interactive 3D model of OPGW Cable Route Assembly

Brackets and mounts

OPGW Cable Route Assembly

4 views
Bounding box
210.0 × 13.5 × 223.3 mm
Engine
Precision B-rep
Parameters
7
Published
August 25, 2026

Download

Free to download and use. See the terms.

The prompt

Draw a overhead OPGW wire cable route,two route in single electrical route,each route is 20.5km,in each pole there 2m raised bar bracket with cap as i will share on picture which is used to hold OPGW cable,distance from one pole to another is 80m,height of concrete pole is 15m,in every 4.5km there must be a OPGW junction box to join the comming cable and ongoing cable,at first from the substation there 400m of ADDS fiber cable join with OPGW cable and at the end the OPGW cable join with ADDS fiber cable going to the destination substation,on the drawing show the ADSS fiber goes about 1.5m underground to the subatations

Parameters

NameValueRange
Pole Height (scaled)15 mm10 – 20
Pole Spacing (scaled)80 mm50 – 100
Route Length (scaled)205 mm150 – 250
Bracket Height (scaled)2 mm1 – 5
Cable Diameter (scaled)0.5 mm0.2 – 1
Junction Box Spacing (scaled)45 mm30 – 60
Underground Depth (scaled)1.5 mm0.5 – 3

Every value above is a live dimension. Open a model like this in the editor and each one becomes a slider you can drag before exporting.